The Gordon River Greenway Park (GRGP) project covers approximately 124 acres located near the southeast quadrant of the Goodlette-Frank Road/Golden Gate Parkway intersection. It includes the West Node to the West off of Goodlette-Frank Road at the south side of the Naples Zoo and a Northeast Node to the northeast along Golden Gate Parkway just …
The Blair Bridge project includes the construction of a 2,810-linear-foot pedestrian bridge and boardwalks. The 330-foot bridge spans the Gordon River and has aashto beams and pre-stressed concrete piles spanning a width of 100′ on the water for boats to go through. The middle of the bridge includes a pavilion. The 550-foot boardwalks have IPE …