The Henryetta Grade Center and STEM Project consists of two new buildings on the Henryetta Public School campus. The grade center is a 9,000 square-foot building. Approximately 5,000 square feet of the building is a safe room. The grade center also has approximately 22,000 square feet of paving and sidewalk on the exterior. The STEM …
The Oklahoma State University (OSU) College of Engineering, Architecture and Technology’s CEAT Undergraduate Laboratory Building will serve OSU’s undergraduate students in the CEAT degree with new laboratories. The project features 14 new undergraduate research labs, a lecture hall and student project spaces across four floors. It is a steel-frame structure consisting of approximately 24,600 square …
The Arvest Data Center is a 25,500 square foot building with approximately 20,000 square feet of slab on a metal deck. The building skin is pre-cast panels, which Cantera worked around when placing the slab on grade and the second-floor decking.
Lake Murray State Park Lodge is Oklahoma’s oldest and largest state park located in Ardmore, Oklahoma. Lake Murray State Park Lodge is a $25 million project consisting of a new lodge, restaurant, ballroom, hotel and cabins (32 rooms) as well as renovations to the existing lodge and grounds.
The scope of work for the Oklahoma State Capitol Restoration – Interior Rehabilitation includes repair and replacement of the backbone infrastructure serving the Capitol building. In compliance with the legislative mandate and in coordination with the State Capitol Repair Expenditure Oversight Committee, the electrical, mechanical, plumbing and HVAC systems will be repaired or replaced including vital …
Continue reading “Oklahoma State Capitol Restoration – Interior Rehabilitation”