Please enable JavaScript to view full site.
  • Pasco County Technology Center

    The Pasco County Technology Center houses the Pasco Board of County Commissioners’ information technology support systems and elections supervisor. The 57,000-square-foot building includes a data room, early voting room, absentee ballot room, training center, call center, emergency operations center, conference room, and office space. The hurricane-hardened facility is equipped with two generators with the capacity …

    Read More
  • Secure Administration Operations Facility, INSCOM

    Located on an active military base, the Secure Administrative Operations Facility (SAOF) project is a 381,000-square-foot addition to the existing Nolan Building, which houses Army Intelligence Resources. The building is an administrative facility that equips the U.S. Army Intelligence and Security Command (INSCOM) for future operations. INSCOM needed a facility designed and built to adapt …

    Read More
  • Defense Intelligence Analysis Center Addition at Bolling AFB

    The Defense Intelligence Analysis Center (DIAC) Addition is a new 470,365 square foot multi-story, multi-purpose Sensitive Compartmented Information Facility (SCIF) administrative and operations building adjacent to the existing DIAC facility on Bolling Air Force Base in Washington, DC. This facility provides critical space to support the agency’s mission requirements in the collection and analysis of …

    Read More
  • Wacker C144 Building Interior Build-Out

    The Wacker C144 project is the interior build-out of a four-story, 139,101-square-foot industrial chip manufacturing facility in Charleston, Tennessee. It includes new office spaces, logistics areas, locker rooms, and break rooms. Manhattan also installed overhead coiling doors, high-speed fabric doors, overhead spiral coiling doors, oversized metal doors and frames, high-performance resinous flooring, polished concrete floors, …

    Read More
  • Drive Automotive Phase VII – Expansion

    The Drive Automotive Phase VII – Expansion project was the construction of the infrastructure and installation of new large-scale manufacturing press pits in the BMW facility plant in Greer, South Carolina. The new automobile body stamping press creates body parts specifically for Z4, X3, X5, and X6 models. The new press pit foundation included pits, …

    Read More
Load More