The Prairie House Assisted Living and Memory Care project in Broken Arrow, Oklahoma is a one-story, 21,288-square-foot, 32-bed memory care center with an attached two-story, 69,029-square-foot, 85-bed assisted living residence with grade beams and exterior columns. Both the memory care and assisted living buildings are composed of spread-footing and post-tension grade beam foundation with an …
Continue reading “Prairie House Assisted Living and Memory Care Facility”
The Parish of Christ the King Exterior Remodel and Addition project included a phased exterior remodel and addition to an occupied school campus and existing facility. Phase I of this project included a structural steel porte-cochere on the East side of the existing school. This serves as an additional drop-off point for students and guest …
Continue reading “The Parish of Christ the King | Exterior Remodel and Addition”
Cantera placed more than 18,000 cubic yards of concrete in a little over one year for the ONEOK Field project. The stadium is home of the Tulsa Drillers minor-league baseball team. The 7,833-seat stadium has a 360-degree concourse that provides fans a view from all sides of the field. The stadium’s 26,000-square-foot basement houses two dugouts, two locker rooms, an umpire’s locker room, …
The Utica Place Building III project includes the construction of a 72,000-square-foot multi-use facility and an underground parking garage an a separate parking garage that provide 147 spaces combined. Cantera Concrete Company performed cast-in-place and other concrete work included piers and grade beams supporting multiple floors of post-tension flat slabs. The building is a split-level shell …
Guthrie Green Park constructed under a fast-track schedule in a dense urban environment and includes a performance space and a pavilion, which houses a café. The landscape and hardscape includes gardens with native plants and trees, brick and concrete paved paths, a bocce court and a large rolling lawn. Water features throughout the park include …