The Florida Gulf Coast University Academic Building 7 project includes a four-story, 60,163-square-foot structure which serves as a teaching and learning facility for the College of Arts and Sciences. The building houses eight large classrooms including math, computer, scale up biology, scale up physics, scale up marine systems, and scale up chemistry, lecture hall, 16 …
Continue reading “Florida Gulf Coast University Academic Building 7”
The Blair Bridge project includes the construction of a 2,810-linear-foot pedestrian bridge and boardwalks. The 330-foot bridge spans the Gordon River and has aashto beams and pre-stressed concrete piles spanning a width of 100′ on the water for boats to go through. The middle of the bridge includes a pavilion. The 550-foot boardwalks have IPE …
The Hilton Marco Island Beach Resort is owned and operated by the Olshan Group. Our client, chose a delivery method of Construction Management with Cost of Work plus a fee without a guaranteed Maximum Price (GMP). The type of contract chosen was based upon the amount of unforeseen conditions that could potentially be uncovered while …
Continue reading “Hilton Marco Island Beach Resort First Floor Renovation”
The Marco Island Hilton 11th floor renovation and addition involved demolishing the existing rooms and finishes on the 11th floor and recapturing the existing balcony space to create additional penthouse style units. This was a fast-track project, as the owner was losing rental revenues while the construction is underway. The project also required coordination with …
Continue reading “Hilton Marco Island Beach Resort 11th Floor Addition and Renovation”
The project replaces the Parking Access and Revenue Control System for Tampa International Airport. Manhattan Construction’s design-build services include the renovation of the entry and exit plazas for the long-term, short-term, and economy-parking garage. Automated Parking Guidance Systems (APGS) added garages assist users by displaying the quantity and approximate locations of available parking spots. The …
Continue reading “Tampa International Airport Parking Access and Revenue Control System Replacement”